Rehabilitation and extension of sewerage network and accompanying water supply network
"Rehabilitation and extension of sewerage network and accompanying water supply network in Shumen - stage 2 within the project No. DIR 51011116-23-65 integrated water cycle for the city of Shumen - stage 2 - Operational Programme "Environment 2007-2013".
Completed are the types of work by parts:
-
construction works on sewerage branch 3 household;
-
sewer branch 4 mixed;
-
sewer branch 5 mixed;
-
sewer branch 11 split;
-
sewer branch 12 mixed;
-
sewer branch 15 mixed;
-
pusher of PSC 2 - Ф225;
-
profile 561;
-
outflow duct for storm overflow drain 1, 2, 3 and 4;
-
PSC 2;
-
water supply pipeline on bul. Simeon Veliki and Dedeagach str.
-
water supply pipeline parallel branch 15 to IB1;
-
water supply pipeline to PSC 2;
-
earthworks (excavation, embankment, compaction);
-
laying water and sewage pipes
-
construction of sewage pumping station (incl. delivery and installation of equipment); ripping and restoration of road and pavement;
-
total water supply pipeline 5073 m;
-
total sewage 9495 m.