Design and complete construction of the pool

Design and complete construction of the pool and changing rooms, including delivery and installation of equipment, installations and cladding village of Kranevo, Municipality of Balchik - 2010

 

 

Completed are the types of work by parts:

 

  • outdoor swimming pool with dimensions 20/50 m with overflow boards and adjacent compensation tank;

  • system for drainage of high groundwater;

  • male and female changing rooms with toilets and showers;

  • storage facilities for equipment for maintenance of the pool;

  • inventory storage room portable sports equipment.

     

Construction works by parts:

 

  • Constructive;

  • Architectural;

  • Electrical and HVAC (heating, ventilation and air conditioning) systems;

  • Fabrication and installation of reinforcement;

  • Finishes.