Construction works for complete construction of an outdoor training pool of size 50/20 m

Construction works for complete construction of an outdoor training pool of size 50/20 m, located in RLP XI, sq. 49 on the plan of village of Kranevo, Municipality of Balchik - 2014

 



Completed are the types of work by parts:

 

  • outdoor swimming pool with dimensions 20/50 m, with overflow boards and adjacent compensatory tank and technical room;

  • vertical planning;

  • construction works on parts: Overall, Architectural, HVAC;

  • implemented systems: draining of high groundwater, widening of pavements, site sewerage pipeline with diameter Ф200 - 48 m and Ф250 - 43 meters.