Construction works for complete construction of an outdoor training pool of size 50/20 m
Construction works for complete construction of an outdoor training pool of size 50/20 m, located in RLP XI, sq. 49 on the plan of village of Kranevo, Municipality of Balchik - 2014
Completed are the types of work by parts:
-
outdoor swimming pool with dimensions 20/50 m, with overflow boards and adjacent compensatory tank and technical room;
-
vertical planning;
-
construction works on parts: Overall, Architectural, HVAC;
-
implemented systems: draining of high groundwater, widening of pavements, site sewerage pipeline with diameter Ф200 - 48 m and Ф250 - 43 meters.