Closure and reclamation of the landfill for municipal solid waste
Closure and reclamation of the landfill for municipal solid waste in the Municipality of Oryahovo - 2014
Completed are the types of work by parts:
-
excavation and removal of waste - 39 912 cub. m;
-
leveling the layer of earth 20 cm - 1660 cub. m;
-
clay screen 50 cm thick - 4150 cub. m;
-
blanket drainage 50 cm thick - 4150 cub. m;
-
sub humus layer with a thickness of 30 cm - 2490 cub. m;
-
soil-building humus layer with a thickness of 20 cm - 1660 cub. m;
-
drainage pipes - 704 m;
-
embankment ditch - 620 m;
-
lined ditch - 50 m;
-
monitoring wells - 3 pcs .;
• depth level benchmark - 1 pc .;
• leveling benchmarks for subsidence the landfill - 2.
In biological reclamation 1-st year were performed the following works:
-
fertilization and planting saplings - 11852 pcs.;
-
fertilizing and seeding with grass mixtures – 3.675 acres.