Sport and water-amusement facilities

Construction works for complete construction of an outdoor training pool of size 50/20 m

Construction works for complete construction of an outdoor training pool of size 50/20 m, located in RLP XI, sq. 49 on the plan of village of Kranevo, Municipality of Balchik - 2014

Construction works for complete construction of an outdoor training pool of size 50/20 m, located in RLP XI, sq. 49 on the plan of village of Kranevo, Municipality of Balchik - 2014

Β 



Completed are the types of work by parts:

Β 

  • outdoor swimming pool with dimensions 20/50 m, with overflow boards and adjacent compensatory tank and technical room;

  • vertical planning;

  • construction works on parts: Overall, Architectural, HVAC;

  • implemented systems: draining of high groundwater, widening of pavements, site sewerage pipeline with diameter Π€200 - 48 m and Π€250 - 43 meters.

Related projects

Repair of hotel "Rubin"
Hotel and holiday buildings

Repair of hotel "Rubin"

Repair of hotel "Rubin" in 2003

Residential building at 5, "Peter Delyan" str.
Residential buildings

Residential building at 5, "Peter Delyan" str.

Residential building at 5, "Peter Delyan" str., city of Shumen, 1998